Center View Drive

FABB reminds local Sully District riders that they have until 7 April to comment on the proposed bike lanes to be installed as part of the summer repaving and restriping program.

While FABB is always glad to see new bike facilities, new doesn’t always mean optimal. We depend on local riders to share their knowledge of their local areas and road conditions to help VDOT and FCDOT ensure that the proposed bike lanes improve the biking experience.

Please take a few minutes to review the VDOT presentation slides and then share your thoughts on the proposals with FCDOT here.

Rugby Road

Proposals for 2021 include:

Rugby Road between Lee Jackson Memorial Highway and Fairfax County Parkway: VDOT and FCDOT are proposing to convert the underutilized outside travel lanes to buffered bike lanes to calm travel speeds, and improve bicycle access, pedestrian safety and comfort.

Daly Drive between Willard Road and Brookfield Corporate Drive: VDOT and FCDOT are proposing to add a center line and bike lanes.

Center View Drive between Lee Jackson Memorial Highway and Lowe Street: VDOT and FCDOT are proposing to restripe the road with two travel lanes, bike lanes, and a center left turn lane or buffered bike lanes in the wider sections.

Sullyfield Circle

Sullyfield Circle from Lee Jackson Memorial Highway to Sullyfield Circle: VDOT and FCDOT are proposing to add bike lanes. Existing on-street parking will be maintained.

Brookfield Corporate Drive from Sullyfield Circle to the end of the road: VDOT and FCDOT are proposing to add bike lanes.

Don’t wait! The comment period closes on Wednesday.

Please follow and like us:
Pin Share